On December 6, an electric power worker passed through the icy bushes to patrol the power supply line at Shazi Hillside, Maoping Township, Longshan County. Affected by strong cold air, the county's high-altitude mountainous areas are frozen. The electric power personnels conduct special inspections on the power supply lines to ensure their safe and stable operation. (Photo/Tian Liangdong)
This article is from Hunan Provincial Government. www.enghunan.gov.cn.
Translator: Yu Jiangjiang
Chinese source: hunan.gov.cn